BUILDING AUTOMATION SYSTEM - DATACENTER
- BACK
Project information
- Category: Iot and Automation
- Project date: Jan 2023
Project Story
This project involved developing comprehensive control and monitoring systems for a data center. The tasks included creating the architecture and electrical drawings for the control and monitoring systems, as well as designing the interface for a web-based SCADA (Supervisory Control and Data Acquisition) system for two sites within the data center. I developed a monitoring program to track power meters, temperature and humidity sensors, and two generators, as well as a controlling program for the data center's air conditioners. Additionally, I created a program to manage the operation of eight air conditioning units, ensuring they operated in a sequential manner to optimize cooling efficiency.
Hardware used:
- 1 PLC
- 18 Power meters
- 4 Temp and Humd Sensors
- 8 Air Conditioners
- 2 Generator
- Fire Alarm Systems
- Access Door
- CCTV
Architecture of this project:
This comprehensive setup ensured effective monitoring and control of the data center's environmental and power conditions, contributing to a well-regulated and efficient operational environment.